CM Demolitions undertook a project to demolish a 550sqm semi-detached warehouse in Swindon as part of a full site clearance and demolition.
1. Semi-Detached: The adjacant warehouse was still in use for the duration of the demolition.
2. Live Power: There was live power in both the adjacent building and in high voltage underground cables underneath the site.
3. Asbestos: The site was known to have asbestos prior to the demolition, necessitating careful removal to comply with safety regulations.
1. Thorough Planning: CM Demolitions conducted a detailed site analysis to develop a comprehensive demolition plan that addressed safety concerns and logistical challenges, including a Site Waste Management Plan and Risk Assessment & Method Statements.
2. Asbestos Abatement: Certified professionals were employed to safely remove and dispose of asbestos-containing materials in compliance with environmental regulations.
3. Structural Demolition: Utilizing advanced demolition equipment, CM Demolitions executed a systematic and controlled demolition process to maximize safety and efficiency.
1. Safe and Efficient Demolition: The project was completed with zero incidents or accidents, ahead of schedule.
2. Sustainable Practices: CM Demolitions prioritized environmentally friendly demolition methods, recycling materials wherever possible. 98% of demolition debris were recycled in this project.
CM Demolitions successfully navigated the challenges of the demolition, ensuring this was done ahead of schedule allowing the site owner to move onto their next phase of development early.
This case study highlights our commitment to excellence in demolition projects, ensuring the successful transformation of outdated facilities into spaces that meet the evolving needs of the community.