CM Demolitions undertook a large soft strip project for a 40,000 SQ ft Gym in Devonshire Square, Central London of a Commerical Gym.
1. Central Location: This central London location was had a lot of Neighbours and a complicated permit system.
2. Site Access: The site was hard to access, with egress being 2 floor underground with limited lift access.
3. Large site: Our team was compiled of 18 Operatives to ensure a thorough and fast demolition.
1. Thorough Planning: CM Demolitions conducted a detailed site analysis to develop a comprehensive demolition plan that addressed safety concerns and logistical challenges, including a Site Waste Management Plan and Risk Assessment & Method Statements.
2. Structured Teams: With the large number of operatives the team was broken into sub-teams, to ensure efficient and fast demolition.
3. Own Equipment: We used our own equipment and plant, as well as sub-contracting some of the waste solutions
1. Safe and Efficient Demolition: The project was completed with zero incidents or accidents.
2. Fast work: The work was completed on schedule, allowing the next stages of the project to be completed.
CM Demolitions successfully navigated the challenges of stripping out a disused gym, in a very central location to ensure the project was able to continue on time.
This case study highlights our commitment to excellence in demolition projects, ensuring the successful transformation of outdated facilities into spaces that meet the evolving needs of the community.